Request an Inspection
Planning & Development Services uses a phone-automated inspection scheduling system that allows you to schedule, change and confirm inspections, as well as request inspection results. To speak to a P&DS staff member, press “o.”
Automated inspection scheduling is available 24 hours a day at 303-441-3280.
You may also use the Construction Permit Status Report to find out what inspections are needed, scheduled and/or completed for your permit.
Note: A responsible party must be present during the inspection.
How to Schedule an Inspection
- Dial 303-441-3280.
- Press “1” for building inspections.
- Press “1” to request an inspection.
- Enter your nine-digit permit number (Example: 200209999).
- Enter an onsite contact phone number.
- Enter the four-digit inspection code.
- Select a date for inspection.
- Request to have inspection results faxed to you, if desired.
Before Your Inspection
Complete the information sheet in the permit packet, and leave it with the permit on the construction site.
How to Schedule All Rough or All Final Inspections at One Time
If you need to schedule all of your rough or final inspections at one time, you can use a single Inspection Code.
Check this page after 9 a.m. to view the daily inspection schedule. You can also confirm your scheduled inspection date with our automated scheduling system:
Change your Inspection Date
- Dial 303-441-1880.
- Press “2” for Inspection Requests.
- Press “1” for Building Inspections.
- Press “2” for Future Inspections.
- Press “2” to Change Future Inspections.
- Enter your nine-digit permit number (Example: 200209999).
- Enter the four-digit inspection code.
- The inspection scheduling system will play the date of the scheduled inspection.
- Press “2” to change the inspection date.
- Select a date for inspection.
Inspection Codes
* To schedule all rough inspections at one time, use code 5000.
+ To schedule all final inspections at one time, use code 6000.
Mechanical
• Gas Meter: 1820
• Gas Piping *: 1825
• Rough Mechanical *: 1835
• In-Floor Heating: 1836
• Commercial Ceiling Mechanical: 1837
• Final Mechanical +: 1840
• Rough Grease Hood *: 1855
• Final Grease Hood +: 1860
• Hood & Duct Welding: 1862
• Rough Wood Stove *: 1865
• Final Wood Stove: 1870
• Product Conveying System: 1875
• Refrigeration: 1880
• Comfort Cooling A/C: 1885
• Boiler & Water Heater: 1890
Plumbing
• Underground Plumbing: 2105
• Rough Plumbing *: 2110
• Shower Pan: 2111
• Oil and Sand Separator *: 2112
• Final Plumbing +: 2115
Elevator
• Rough Elevator: 2410
• Final Elevator: 2440
Planning and Land Use
• Final Fence-Retaining Wall other +: 2510
• Final Flood +: 2520
• Final Wetland +: 2525
• Final Right-of-Way +: 2540
• Final Sign other +: 2550
• Final Site Drainage +: 2560
• Final Fire Inspection Structure +: 2570
• Final Landscape & Sitework +: 2580
• Final Water-Wastewater +: 2590
Structure
• Footings-City Inspection: 1205
• Foundation-Flood Inspection: 1215
• Foundation-City Inspection: 1220
• Framing *: 1230
• Rated Shaft: 1231
• Floor Joist: 1233
• Insulation Ceiling *: 1235
• Insulation Floor: 1236
• Insulation Foundation: 1237
• Insulation Underslab: 1238
• Insulation Wall *: 1240
• Lath: 1243
• Final Structure +: 1255
• Floor Siding +: 1256
• Rough Siding *: 1257
• Mobile Home Setup +: 1260
• Shear Nailing: 1263
• Sheetrock Nailing: 1265
• IECC Compliance: 1270
• Green Points Compliance: 1275
• Progress and/or Consultation: 1280
Roof
• Mid-Roof: 1245
• Reroof-Pre-Insp (flat roofs): 1247
• Final Roof +: 1250
Electrical
• Underground Electric: 1505
• Temporary Construction Power: 1510
• Rough Electrical *: 1515
• Commercial Ceiling Electric: 1519
• Rough Electric Swim Pool: 1521
• Final Electric Swim Pool: 1522
• Final Electrical +: 1525
• Final Electric Sign: 1528
• Final Electric Meter +: 1540
* To schedule all rough inspections at one time, use code 5000.
+ To schedule all final inspections at one time, use code 6000.