Multimodal Corridors |
|||||||||
|
Click on the maps below for a larger view
|
||
|
Current Funding |
Action Plan |
Vision Plan |
What improvements are proposed?
The 10 corridors' improvements include:
Roadway
- Roadway reconstruction to reduce long-term maintenance liabilities;
- Improved operational and traffic flow through intersection enhancements focusing on system “bottlenecks”;
- Roadway improvements which support multi-occupant vehicle use;
- Roadway-related (functional efficiency/safety) improvements in priority corridors; and
- Signal coordination optimization based on current traffic flow patterns.
Pedestrian
- Complete segments of missing sidewalks to provide direct and continuous connections between destinations and to transit;
- Continue adding enhanced pedestrian crossings at strategic locations; and
- Continue installation of pedestrian signals and crossing count-down heads.
Bicycle
- Complete missing bicycle trails and bicycle lanes to provide direct and continuous connections;
- Construct needed underpasses at high volume locations to provide safe connections; and
- Provide bicycle route signage.
Transit
- Deploy the high-frequency Community Transit Network (CTN);
- Construct enhancements at key high-frequency transit stops to include, at a minimum, transit signs and pavement platforms. At higher demand transit stops, shelters, benches and trash receptacles will be provided; and
- Operational system efficiency improvements, such as bus bypass lanes, bus signal prioritization and other improvements to increase the efficiency of the CTN.
Click here to learn about Transportation Network Plans (TNPs).
Build Upon What is Working ... Community Transit Network
The implementation of the city's Community Transit Network (CTN) originated with the HOP and SKIP services and was fully planned in the 1996 TMP. This transit service has been highly successful at minimizing congestion impacts in corridors such as Broadway and has increased transit ridership more than 400 percent since 1990. The CTN has been supported by the public for both continuation and expansion as funds are available. Currently there are six (6) CTN services: HOP, SKIP, JUMP, BOUND, STAMPEDE and DASH; and the DART service to Longmont will start in 2004. The Current Funding program proposes continuation of these services for the life of the TMP for local funding to support service above the RTD base service level. The Action Plan builds on the CTN success and adds two important services, the LEAP (east Boulder) and the ORBIT (28th and Folsom loop), to serve the areas where the majority of development and redevelopment is expected to occur. The long-term vision for Boulder is to provide a network of 13 CTN services integrated with the RTD services as well as to enhance transit with real-time information and supplement Gunbarrel fixed route service with Call-n-Ride services.
Click on the maps below for a larger view.

View all three Investment Packages for Transit
Last Updated on Tuesday, 23 October 2012 08:15




Improvements to these corridor segments are dependent upon the available funds. Eleven (11) of the 42 corridor segments can be constructed under the Current Funding program, the additional funds identified in the Action Plan would allow 21 of the corridor segments to be implemented, while the Vision program builds out all 42 segments (