Project Status:

The Yarmouth Transportation Improvements Project was completed in October 2009.  The purpose of the project was to upgrade the street so it can better facilitate all travel modes. The project was identified during the North Boulder Subcommunity Plan planning process and is included in the 2002-2007 City of Boulder Capital Improvements Program (CIP).

The following improvements have been completed by the city or coordinated with development:

  • Street resurfacing of Yarmouth Avenue from Broadway to 16th streets with bike lanes and sidewalks in both directions;
  • Speed display for eastbound Yarmouth at 15th.
  • Asphalt widening and street resurfacing with paved shoulders on Yarmouth from 16th Street to U.S. 36 (28th Street);
    • This eliminated the existing asphalt path that runs along the south side of Yarmouth from 16th to 19th streets. Sidewalk and curb/gutter will not be constructed at this time. Signage will be posted indicating that pedestrians and bicyclists can use the paved shoulder facility.
  • East of 19th - Pavement widening to accommodate paved shoulders.
  • Some storm drainage improvements.
  • The overhead electric lines and poles from Broadway to U.S. 36 have been removed and replaced with an underground facility.


Yarmouth Before the Improvements

Yarmouth Looking West
Looking West on Yarmouth.

Yarmouth Looking East
Looking East on Yarmouth.
 

Yarmouth After the Improvements

Yarmouth Eastbound
Yarmouth Eastbound

Yarmouth at Broadway
Yarmouth at Broadway

For up-to-date information on traffic impacts, see cone zones.


Contact Information: 

For additional information on the Yarmouth Improvements Project, call Noreen Walsh, City of Boulder Public Works, Transportation Division
303-441-3266.

City of Boulder
Transportation Division
1739 Broadway
Boulder, CO 80302
Phone: 303-441-3266
Fax: 303-441-4271
E-mail: This e-mail address is being protected from spambots. You need JavaScript enabled to view it


Clicking any flag icon above calls Google translation service to translate the page to the language you have chosen. Graphics containing text, PDF files, and special applications on this page cannot be translated. As with any computer translation, conversion is not context-sensitive and may not convert text into its intended meaning. The city of Boulder does not guarantee the accuracy of translated text. If the information you are seeking is not clear please return to the main page for the specific city department and contact them directly. Please note that some applications and/or services may not work as expected when translated.

Plugins needed for this Web site: [ Adobe Reader ] [ Flash Player ] [ Quicktime ] [ Real Player ]