Betasso Area Pipelines Replacement ProjectWhat's New:
For the remainder of August, crews will be completing the pipe installation on the north side of S.H. 119 (just east of the tunnel). Please call the project hotline (or visit Cone Zones) at 303-441-1888 for details concerning daily activities and traffic delays. The Link Trail (located on the east side of Betasso Preserve) will remain closed until at least Monday, Aug. 31, 2009. The closure is necessary to maintain safety while excavation work takes place near the trail. The base of the trail, at S.H. 119, will be used for material and equipment storage, which will also require restricting access to S.H. 119 from the trail. Parking will in the area will also be restricted. Also, please note that work areas are dangerous! If an area is barricaded, fenced, or signed, only authorized personnel should enter. Please help us ensure your safety by staying clear of all work zones. For more project construction and traffic updates visit Cone Zones. For construction e-mail updates, subscribe to the Betasso Area Pipelines Replacement Project e-mail list. Follow the above link, choose "pw-betasso-pipelines-replacement-news" from the drop-down list and subscribe to receive the latest news and project updates. Once construction begins, traffic restriction and project information will be sent to this e-mail list frequently. Interested parties can also receive current project information and leave a voicemail concerning any questions or comments by calling the project hotline at 303-441-1888. Messages will be checked on a daily basis during construction.
The City of Boulder Utilities Division proposes to replace portions of the Orodell Pipeline and Betasso Penstock located in the vicinity of the Betasso Water Treatment Plant ( (Return to the top of the page)
Project Objectives: The Utilities Division proposes to construct a new, 30" diameter, welded steel and concrete mortar pipeline to replace the existing 20" pipeline from the Boulder Canyon Hydroelectric facility to the Betasso Hydroelectric facility. The new pipeline would parallel the existing 20" line. The new 30" pipeline would achieve several significant objectives:
The proposed project meets the general goals for the city's water utility:
(Return to the top of the page)
(Return to the top of the page)
(Return to the top of the page) Existing Layout:
(Return to the top of the page)
Joseph Taddeucci, Utilities Project Manager
Robert Harberg, Utilities Project Coordinator (Return to the top of the page) Last Updated on Thursday, 20 August 2009 09:57 |
Clicking any flag icon above calls Google translation service to translate the page to the language you have chosen. Graphics containing text, PDF files, and special applications on this page cannot be translated. As with any computer translation, conversion is not context-sensitive and may not convert text into its intended meaning. The city of Boulder does not guarantee the accuracy of translated text. If the information you are seeking is not clear please return to the main page for the specific city department and contact them directly. Please note that some applications and/or services may not work as expected when translated.